11 February 2015 - Day 58 - Structured Wiring Meeting

Just had my structured wiring meeting this morning to go over the exact locations for 5.1 speaker wiring, deck speaker wiring, alarm sensor locations, cable TV, Data CAT5e, and Telephone jack locations. 

I also had them add some extra bundles of CAT5e and COAX cable from the panel to the attic for a future HDTV antenna, Dish TV and for potential future expansion since he couldn't do a conduit run.  I also requested a run of additional CAT5e cable to the front door and patio door to run POE video cameras. 

While on site the plumbers and electricians got a lot of work done. The PM was also very helpful answering all my questions. He also stated that we should plan on a pre-drywall meeting sometime on Monday. 

Day 58

Master Upgraded shower and tub

Spare full bathroom

Spare bathroom looking into Master Bathroom. All that plumbing goes to the sinks. 

Double master sink plumbing

Tyvek covering a portion on the loft flooring

Gas and water lines that will go to the tankless water heater.  That sprayed green stuff is a termite deterrent. 

Duct work