On a positive note, as we visited the property yesterday, it didn't look like much got done till a subcon dropped off one worker to work on the front porch around 5pm. This afternoon we noticed that 3 additional layers of brick were added to the porch along with some steps. I have some reservations with the job done and also the brick matching. For now I'm gonna say that the bricks done yesterday may be wet.
Additionally, the vinyl siding looks complete with the exception of the right side shaker. I'm thinking they ran out of material, as it wouldn't have been more that 20 mins of work left.
Lastly, it sounded like there was a loud hum coming from inside the property which makes me think the propane heater was back up and running and more mudding was accomplished.
Here are a few pictures from today:





